If your condo or HOA receives a roof-related insurance non-renewal notice, start with the notice itself. Record the policy end date, the stated roof concerns and any inspection or repair conditions. Send it to your insurance broker and property manager so the board can build a dated action plan.
Find out what the insurer is asking for
Non-renewal, cancellation and a request for roof repairs are different notices. Do not assume they have the same deadlines or effect. Ask your broker to explain the notice and confirm what evidence the insurer will accept.
Questions to send your broker
- What is the exact coverage end date?
- Which buildings or roof sections are identified?
- Is the concern roof age, condition, maintenance or an unresolved inspection item?
- Will the insurer review updated inspection or repair records?
- What replacement coverage options should the board review?
Keep written answers in the association’s project file. A contractor can document roof condition and proposed work. The insurer decides coverage and renewal terms.
Order a roof condition report by building
Ask for dated photos, roof system details, known installation dates, visible defects and a map of the affected sections. Separate active leaks, urgent repairs, maintenance items and areas that may need replacement. Include repair history and warranty records when available.
An inspection should explain the limits of what was observed. Hidden deck or insulation damage may need additional investigation. Avoid promising that a short repair will extend the roof’s life or satisfy the insurer without written support.
Do not assume age proves storm damage
Roof age, wear and storm damage are separate issues. Document observations accurately. If a claim is being considered, discuss the policy and evidence with the appropriate insurance professional.
Compare repair and replacement options
Ask the roofer for a written scope, expected timing, access needs, exclusions and any limits on temporary repairs. For a multi-building property, request a building-by-building plan so the board can understand cost and scheduling.
Send the proposed work to your broker before treating it as a solution to the notice. The insurer may have specific requirements for records or completed work. A bid or scheduled project alone may not meet those requirements.
Build a board action plan before coverage ends
- Log the notice and confirm deadlines with the broker.
- Collect roof records and arrange the needed inspection.
- Get comparable proposals for the defined work.
- Review reserves, funding and approval steps with the manager.
- Confirm the insurance plan while work is being arranged.
- Document completed repairs and request written follow-up from the insurer.
Have association counsel review disputed notice or approval questions when needed. Tell residents about confirmed project impacts without promising renewal or claim payment.
Keep one complete roof and insurance file
- Notice, policy details and broker correspondence.
- Roof installation dates, warranties and repair history.
- Dated inspection photos and roof condition report.
- Bid comparison, signed contract and funding records.
- Resident notices and work schedule.
- Completion photos, inspection records and insurer responses.
Questions HOA boards ask
Does replacing the roof guarantee insurance renewal?
No. Ask the insurer or broker for written requirements and available coverage options. Roof work does not guarantee renewal or a specific premium.
Should the HOA repair the roof before getting a replacement quote?
Address urgent conditions and document them. Compare the repair scope with replacement needs and the insurer’s requirements before committing to a larger project.